What to work through while you’re weighing things up
You’ve already looked into ProSteel, but you might still be sorting the finances, deciding what you need or waiting for the right time.
A building is a significant investment. It makes sense to do your homework. Here are five things you can work through now to make the next step easier.
1. Get clear on what the building needs to do
Before getting too far into dimensions or design, think about how you’ll use the space day to day.
What needs to fit inside? Will you need room to work around vehicles or machinery? Are you likely to need more storage or workspace in a few years?
Consider:
- Size and height: Allow for your largest equipment, plus room to move.
- Access: Think about door openings, vehicle movements and where you’ll enter.
- Layout: Decide whether you need one open space or separate areas.
A rough sketch and a list of must-haves are a good starting point. You don’t need finished plans before talking to us.
2. Work out a realistic overall budget
If you’re still sorting the finances, start with the cost of the complete project.
Depending on your build and what’s included in your proposal, you may also need to allow for site preparation, concrete, delivery, construction, council fees and service connections.
When comparing quotes, check:
- What’s included—and what you’ll need to arrange separately.
- Whether prices include GST.
- Whether the size, specifications and scope are comparable.
Separate your essentials from the extras you could add later. That gives you a clearer starting point if the budget needs adjusting.
If you have a budget in mind, share it with us. We can discuss what may be achievable before you spend time developing the details.
3. Get familiar with your site
The location of your building can affect its design, cost and construction.
Have a look at the proposed spot. Is it level or sloping? Is there clear access from the road? Are there nearby boundaries, existing buildings or overhead lines to consider?
If you’ll need power, water or drainage, think about where those connections might come from.
You don’t need all the technical answers yet. Your property address, a few site photos and any existing plans can help us identify what needs checking next, including any council requirements.
4. Think about when you want to use it
There’s a difference between wanting to start in six months and needing the building finished in six months.
Planning, engineering, any required approvals, siteworks, manufacturing and construction all need to fit into the programme. The timing will depend on your project.
If you have a deadline—harvest, a business requirement or simply wanting your gear under cover—let us know early.
Even a rough timeframe helps. We can talk through the steps involved so you know when to start making decisions.
5. Get answers to anything holding you back
You might still be comparing suppliers or deciding whether ProSteel is the right fit. That’s a sensible part of the process.
Think about what you need to feel confident moving forward. It could be:
- A clearer explanation of the design and specifications.
- More detail about inclusions and responsibilities.
- Examples of similar completed projects.
- An understanding of the process from quote to completion.
- Council requirements
Tell us what you’re weighing up. We’d rather answer your questions than leave you trying to fill in the gaps.
Where are you at with your plans?
You don’t need to be ready to place an order to get back in touch.
Send us an email and let us know what you’re planning, roughly when you’d like it and what’s still to be worked out.
Whether that’s budget, timing or choosing the right building, we can help you understand your options and your next step.